    CANAPORT LNG IMPORT TERMINAL - Completed in 2008

    Design/Build project for Repsol YPF/Irving Oil in New Brunswick, Canada.  New LNG terminal construction included steel tubular jacket structures, deck sections, rock drilling for large diameter steel pipe piles, trestle superstructure erection, and loading platform and dolphin deck with fenders, Quick Release hooks, walkways, and an access tower.

  • ECOELÉCTRICA LNG MARINE TERMINAL - Completed in 1999 EPC project in Peñuelas, Puerto Rico for the construction of a new LNG Marine Terminal that included a double-deck unloading platform, access roadway and pipeway trestle built on prestressed concrete piles, with mooring and breasting dolphins supported by large steel monopiles.

  •  

    SABINE PASS LNG TERMINAL – MARINE FACILITIES - Completed in 2007

    Provided EPC services for the construction of dual berths designed for LNG vessels for Sabine Pass LNG, LP (Cheniere) in the Sabine Pass Waterway of Cameron Parish, Louisiana.  Project included unloading platforms with LNG unloading arms, gangways, and fire monitor towers and mooring and breasting dolphins with fenders, hooks and an integrated berthing and load monitoring system. Dredging and slope protection were also included.

  •  

    VALERO TANKER BERTH DEMOLITION & CONSTRUCTION - Completed in 2010

    Demolition of existing dock and construction of new VLCC dock supported by steel pipe piling for Valero Refining Company in the Delaware River, Paulsboro, New Jersey. Project included a new seawall, precast and cast-in-place concrete deck with loading arms, stores crane, and gangway tower, and mooring and breasting dolphins.