• Owner/Client: U.S. Army Corps of Engineers Galveston District
    Year Complete: 2004
    Scope of Work: Construction Dredging Levee Construction Stone Revetment
    Project Cost: $105M
    Weeks Marine completed the Houston-Galveston Mid-Bay Navigation Project for the U.S. Army Corps of Engineers, Galveston District.

  • Owner/Client: USACE- Galveston District
    Year Complete: 2011
    Scope of Work: Hydraulic Dredging
    Project Cost: $66M
    Dredging approximately 6.8 miles (4 million CY) of navigation channel, levee repair and rehabilitation, levee raising and shore protection of existing upland placement areas and developing five new placement areas.

  • Owner/Client: USACE Baltimore
    Year Complete: 2002
    Scope of Work: Maintenance & New Work with Upland Disposal
    Project Cost: $29.8M
    WMI was contracted by the Corps of Engineers Baltimore District to perform maintenance and new work dredging of approximately 4.6M cubic yards of material from the Baltimore Harbor inner channels and anchorages.

  • Owner/Client: U.S. Army Corps of Engineers Mobile District
    Year Complete: 2008
    Scope of Work: Dredging
    Project Cost: $8M
    Weeks Marine was contracted by the Corps of Engineers to excavate over 600,000 cy of new material in order to deepen the Mobile River channel to a depth of -47 feet below mean lower low water.

  • Owner/Client: USACE - Galveston District
    Year Complete: Est. 2012
    Scope of Work: Hydraulic Dredging
    Project Cost: $65M
    Dredging:  Initial dredging to remove approximately 1M CY of silt and sand
    (shoaled) material from the Houston Ship Channel (HSC) with placement into
    contained placement areas.

©2011 Weeks Marine, Inc. All Rights Reserved. Website Design & Development by NJ NET